The locking system will be used for the platform lifting mechanism of the riprap leveling ship of the Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project. After being put into use, the hull load can be smoothly converted from the lifting system to the locking system. The maximum vertical load is 2,600 tons. The efficiency of locking or loosening is high, the operation time is only about 10 minutes (usually about 20 minutes in the industry), and the design life is 20 years.
Shield Cover,Pump Sheath,Pump Cover,Pump Housing Cover
Yantai Sino Touch Mining & Construction Equipment Co.,Ltd , https://www.stmcgroup.com