On August 17th, six white-painted Sany SYG5360THB-47m pump trucks completed the concrete foundation construction of Daytona Towers over 7700 cubic meters in one time, creating the largest concrete pouring record of the local monomer.
Sany equipment undertakes all concrete pouring construction
Located in Manama, the capital of Bahrain, Daytona Towers is the core landmark of the Bahrain Bay Business District. With a design layer of 58 floors and a design height of over 200 meters, it is a comprehensive building complex integrating office, hotel, entertainment and catering. It is regarded as a model project for pan-Economic development in the Persian Gulf region.
As a new landmark in Bahrain, the contractor Kooheji Contractors has extremely strict requirements on the quality of construction, and the concrete equipment that has entered the site has been selected. After comparing multiple brands, Kooheji Contractors finally selected Sany's equipment to undertake all concrete pouring construction.
Sany equipment undertakes all concrete pouring construction
Foundation pour is the biggest difficulty in the construction of the entire project. Due to the high temperature and dust in the local area, once the speed is too slow, the concrete will be unevenly solidified, which will lead to cracking. To this end, the contractor required the entire foundation to be poured over 7700m 3 and must be poured in one time within 10 hours. This undoubtedly puts a rigorous test on the output efficiency and stability of the equipment.
During the construction, 6 Sany SYG5360THB-47m pump trucks performed well, and there was no failure in continuous and high-strength operation. While ensuring the quality of construction, its construction time is also reduced by nearly 10% compared with the plan. Excellent performance has been unanimously affirmed by the construction party and the owner.
During the construction, 6 Sany SYG5360THB-47m pump trucks performed well.
According to Kooheji Contractors, the Sany brand is well-known in the Middle East and has a good reputation. In the construction of the Burj Khalifa, Saudi Zamba, New Town, Qatar World Cup venues, etc., Sany equipment can be seen. During the future high-rise construction of Daytona Towers, more Sany equipment will enter the market.
According to reports, since Sany Heavy Industry entered the Bahrain market in 2006, with the excellent product quality and service level, it quickly opened up the situation in the local area. At present, Sany's concrete equipment and lifting equipment have become the first local brand, and the market share of concrete equipment is over 90%. (This article is from Sany)
Welded Wire Mesh,Hot Dipped Galvanized Welded Mesh,Galvanized Welded Wire Mesh,Wire Mesh Plaster Walls
HEBEI CONQUER HARDWARE WIRE MESH CO.,LTD , https://www.conquerwiremesh.com