
Guangfo Company's high-level network posts
Recently, netizens who claimed to be the owner of Guangzhou-Foshan Metro Guangfo Rail Transit Co., Ltd. (hereinafter referred to as “Guangfo Corporationâ€) have posted 5 pieces of postings saying that due to the delay in the opening of the Guangzhou section, the Guangzhou-Foshan subway has not passed the national acceptance. , serious operating losses and other issues.
The Southern Capital Reporter verified that the netizen Mr. Zhou (a pseudonym) was indeed a senior executive of Guangfo Company.
Among the many problems pointed out by Mr. Zhou’s net posts, the unannounced information on the Guangzhou-Foshan subway was surprising. As is known to all, the first pass of the Guangfo Metro (Quayi Road--Silang Section) was officially opened on November 31, 2010 and has been in operation for two and a half years. According to an official report, as of the end of last year, the cumulative passenger volume of the first pass of the Guangfo subway has exceeded 86 million, and last year's average daily passenger flow also rose to 120,100.
Operator: The Guangzhou section was not completed so it was not accepted
“This is true for all the subways in China. After a certain period of time, it was only accepted. (Guangfo subway) itself has not yet completed a test section. When the project is approved, it will be divided into the first phase and the second phase.†Guangzhou Subway Corporation, which is responsible for the operation and management of Guangzhou-Foshan Metro subway station, admits, The first pass section of the Guangfo subway has not yet been accepted. Liu Ru, a spokesperson for Guangzhou-Foshan Company, also stated that since the entire line has not been opened, the first pass of the Guangfo subway has indeed been in trial operation.
It is still unknown when the Guangzhou section is completed
When can Guangfo Metro Guangzhou be completed? Last month, the Guangzhou Metro reported to the media that as of March this year, 63% of the Guangzhou-Foshan Metro Guangzhou (Silang-Lijiao) civil works had been completed. In the seven site intervals, there was still sand inundation to the sand and sand. The construction of the tunnel from the park to Yangang, Nanzhou to Lijiao is under construction. However, the demolition of the Lekki Station has not been completed since it was started many years ago. Affected by this, it is still unknown when the entire project will be completed.
I heard that the first section of the Guangfo subway has not yet passed the acceptance check by the state. Many people worry about the potential safety problems in the subway operation. In this regard, the operator said that the Guangzhou Metro has very rich experience in the operation of the subway. Even if the first pass of the Guangfo subway has not yet passed the acceptance check, its operation is not affected at all and safety is guaranteed. The public need not worry.
JS severs Fuel Dispensers are the new generation
refueling equipments with all properties and functions of ordinary fuel
dispensers for gas stations to fill motor vehicles with gasoline, light
diesel oil.
JS severs fuel dispensers are made up of motors, vane pumps, oil and
gas separators, four-piston positive displacement flow meters, solenoid
valves, signal sensors and computer control components etc. To provide
tax interface. High reliability, fast running, more functions, easy
operation, with the volume, amount, unit price displaying,
quantitatively filling.
JS severs fuel dispensers can randomly filling is
very convenient for operators to fill any vehicles precisely and
quickly, all the fuel dispenser data is shown on LCD displays, clear and
beautiful sighted.
We consider the product quality as enterprise`s life for quite a long time. Our products have reliable quality, they are durable with reasonable price. Our products sell well in Europe (France, Germany, Greece, Ukraine and Russia), America (USA and Brazil), Middle East (Egypt, Israel and Lebanon) and Asia (Japan, South Korea, Vietnam and Philippines). Now our company has more than 200 employees including 38 technicians. Our principle is [Professional originates from concentration"
JS severs fuel dispensers conforms to GB 22380.1, GB 3836.2, GB 2826.2,
GB 3826.4, GB 3826.9 standards, inspected by the National Quality
Supervision Center for explosion proof electrical products, we`ve been
authorized the explosion-proof certificate. The trucking loading fuel
dispenser is manufactured and inspected according to the flowing
standards,
1). GB/T 9081-2008 motor vehicles fuel dispensers
2).JJG443-2006 fuel dispenser national metrological verification regulations
3).GB 22380.1-2008 gas station explosion-proof sechnology Part 1: fuel
dispenser explosion-proof security technological requirements.
LPG Pump/Meter & LPG Dispenser
Thermal Mass Flowmeter, LPG Dispenser, LPG Flow Meter, LPG Gas Flow Meter, LPG Pump Meter
Shanghai Jiasong Machine Co., Ltd , http://www.fuel-dispenser-parts.com